Shopping centers

  • EMONIKA CITY CENTER Ljubljana, Slovenia. Structural design of 123 000 m2 retail and movie area, 12 300 m2 extension of existing railway station, 2011-2012
  • ASIA CENTER Wholesale center, Budapest, Szentmihályi street, 120 000 m2, in situ concrete, 2001
  • CSABA CENTER and PARKING HOUSE 45 000 m2, Békéscsaba, prefabricated structure, 2000-2001
  • CORA MISKOLC HYPERMARKET 30 000 m2 commercial building, plans for site work and prefabricated elements with large spanwidth, 1999
  • MOM MULTIFUNCTIONAL BUILDING Budapest, Alkotás street, 108 000 m2, structural engineering plans, 1998
  • CORA FÓT HYPERMARKET 38 000 m2, plans for site work and prefabricated elements, with large spanwidth, 1998
  • LURDY HOUSE Shopping, office and leisure centre, Budapest, on the corner of Mester street - Könyves Kálmán street, 85 000 m2, 1997
  • M5 SHOPPING CENTRE Budapest, Nagykörösi street. Static permit plans. Underground parking level and 3 storey shopping area. In situ reinforced concrete structure and steel skylight structure, 1995
  • DUNA PLAZA Budapest, Váci street. Structural engineering, 58 000 m2 + parking house. In situ reinforced concrete structure combined with prefabricated elements, 1994-1996

Office buildings

  • K3 OFFICE BUILDING Budapest, Könyves Kálmán street, 35 000 m2, 8 upper levels and 3 basement levels. Combined raft and pile foundation, diaphragm walls, in situ reinforced concrete structures, two main cores, flat slabs, 2008
  • VÁCI STREET 190. OFFICE TOWERS Budapest, 45 000 m2, 55 m high twin towers with 4 basement levels. In situ reinforced concrete structures with centered cores, flat slabs, columns in angles, special steel suspended roof over atrium (30x30 m). The roof geometry follows double curved HP shell, 2007-2008
  • RIVERPARK OFFICE BUILDING Budapest, Közraktár street 32. 3 basement levels + 8 levels, 13 000 m2, foundation raft combined with piles, diaphragm walls around the basement, in situ reinforced concrete structure, reinforced concrete cores, columns, flat slabs, 2006-2007
  • RIVERPARK OFFICE BUILDING Budapest, Közraktár street 30. 1 basement level + 8 levels, 5000 m2, existing brick walls, existing steel beams with brick vaults, concrete ring beams. Structural tasks: increasing the load bearing capacity of slabs, new lift shafts, reconstruction of basement, new steel structures on the roof, 2006-2007
  • P40 OFFICE BUILDING Budapest, Perc street 40. 1 basement level + 5 levels, 6200 m2, existing brick walls, existing reinforced concrete columns, beams, slabs. Structural tasks: new core, reconstruction of basement, new steel structures on the roof, 2005-2007
  • NEWAGE CENTER Budapest, Esztergomi street, 30 000 m2, basement with two level raft-slab combined with diaphragma wall. Upper structure columns, stiffening walls with flat slab. 30 m high atrium for glass structure, 2004-2006
  • HALLER GARDENS Budapest, Soroksári street 32-34. 3 basement levels + 8 levels, 56 000 m2, foundation raft combined with piles, diaphragm walls around the basement, in situ reinforced concrete structure, 8,1x8,1 m grid system, reinforced concrete cores, columns, flat slabs, 2004-2006
  • ROOSEVELT OFFICE BUILDING Budapest, Roosevelt square. Retrofitting and strengthening of existing office building, 35 000 m2, permission documentation and detailed drawings, 2002
  • KÁLVIN CENTER Office building, Budapest Kálvin square, 15 000 m2, reinforced concrete structure with flat slab, 2001
  • ATRONYX OFFICE BUILDING Budaörs, 15 000 m2, in situ reinforced concrete structure with flat slabs, 1999
  • RECONSTRUCTION EXECUTION DOCUMENTATION for Budapest, Dohány street 12-14. building, 11 000 m2, 1999
  • Allianz HEADQUARTER Müchen-Unterföhrig, Germany 100x360 m, 150 000 m2, 8 storeys, two of them under ground level. Monolith structures, 1996
  • Providencia-Generali HEADQUARTERS Budapest, Váci street - Csanády street, 160 pages static's concerning building permit, 9-13 storeys, three of them under ground level. Monolith structures, 1994-1995
  • OFFICE AND BLOCK OF FLATS Budapest, Teve street 3. 120 pages static's concerning building permit, 13 storeys, three of them under ground level. Monolith concrete, 1993

Public buildings, sport establishments

  • FLOWER MARKET AT KOZMA STREET CEMETERY Budapest. Structural design of a flower market with 1900 m2 brutto area at cemetery Kozma. Two levels, precast rc columns, in situ rc flat slab, and walls. Fair faced concrete, 2011
  • SPORT CENTER Budapest, Csörsz street. 2 basement levels + 3 levels, 12 000 m2, foundation raft, pile wall with anchors around the basement, in situ reinforced concrete structure, reinforced concrete walls, columns, flat and ribbed slabs, brick fill in walls, steel roof, 2006
  • HOTEL ORIENT Budapest, Rákóczi street 66. 2 basement levels + 9 levels, 25 000 m2, foundation raft combined with piles, diaphragm walls with inner steel props around the basement, in situ reinforced concrete structure, reinforced concrete cores, columns, flat slabs, brick fill in walls. Rebuild of the existing metro ventillation shaft, 2005-2006
  • NOVOTEL HOTEL Budapest, Bem embankment 33-34. Basement + 8 levels, 9200 m2, reconstruction and extension of the existing reinforced concrete structure according to the new function, 2005
  • KINCSEM PARK NEW GRANDSTAND Budapest, Albertirsai street 2-6. 4 levels, 10 000 m2, line and solitaire foundation, precast and in situ reinforced concrete structure, reinforced concrete walls and columns, prefabricated beams and seat elements, steel roof (cantilever), 2003-2004
  • BUDAPEST ARENA  SERVICE BUILDINGS In situ concrete combined with precast concrete elements, 2002
  • BUDAPEST ARENA New sport centre, 20 000 m2 and 40 000 m2, in situ concrete and steel roof, 2001
  • MILLENNIUMI CENTER MAIN BUILDINGS Budapest, 90 000 m2, permit documentation, in situ concrete structures, 2000-2001
  • Hypo Bank Győr, garage on underground, offices and luxury flats in 4 levels. Monolith concrete structure, 1996
  • Bank AND COMMERCIAL CENTRE (Moritzhoff) Chemnitz, 20 000 m2, monolith structures. 9 storeys, three of them under ground leve, 1996
  • MAIN CATHOLIC CHURCH IN DunaÚjvÁros Structural planning, 2x1500 m2. Pile foundation, monolith concrete structures in combination with steel at the covering structures, 1993

Glass structures

  • M4 METROLINE BOCSKAI STATION Budapest. Structural design of a 80 m long 3-11 m tall double glass wall around the escalator. The glass wall is functioning as fire and smoke wall, 2008-2009
  • M4 METROLINE MÓRICZ ZSIGMOND STATION Budapest. Structural design of a steel-glass entrance building, 2008-2009
  • M4 METROLINE TÉTÉNYI STATION Budapest. Structural design of a 160 m long 5 m tall glass wall along the metro platform. The glass wall is functioning as fire and smoke wall, 2008-2009
  • VÁCI STREET 190. Budapest. The entrance of  the twin tower is covered by a 30x30 m glass roof. The roof geometry follows double curved HP shell. The supporting structures is suspended from two directions with steel cable structures, 2007-2008
  • NEWAGE CENTER Budapest, Esztergomi street. Atrium glass roof  (36x20 m) with one glass wall (H=20 m) facade. The glass structures are supported by slender steel structures which are complemented by prestressing steel cables, 2004-2005

Industrial buildings

  • MERCEDES PAINTWORK HALL at Kecskemét, 22 000 m2 total area, mixed precast and in situ concrete (precast beams, monolithic columns and slabs), 10x12 m grid, high loading, 2009
  • GT26 TEST CENTER POWER STATION Switzerland. Structure: Reinforced concrete foundations and floors, steel superstructure. Buildings: turbine hall, feedwater tower, stack, control building etc. 2009
  • FOUNDATION OF A SPECIAL CONVEYOR RAIL at Dunaújváros. Monolithic reinforced concrete foundation with high dynamic loads and strict displacement requirements, 2007
  • RYNART LOGISTIC HALL at Biatorbágy, 30 000 m2, structure prefabricated elements, production design works, 2003
  • EXTENSION OF WASTE WATER PLANT at Répcelak, in situ concrete, circle basin, 2003
  • WASTE WATER TREATMENT PLANT in Kiskunmajsa, in situ concrete structures, 2002
  • WASTE WATER TREATMENT PLANT in Szeged, in situ concrete digesters, settlers, etc. post tensioned structures, 2001
  • ZOLLNER ELEKTRONIK LOGISTIC HALL Vác, 10 000 m2, site plans and prefabricated elements with 25 m span with, cowered with concrete TT elements, 2000
  • PRODUCTION HALL FOR BOSCH Hatvan, 26 000 m2, 1998
  • PRODUCTION HALL FOR Zollner elektronik Vác, 10 000 m2, site and prefabricated elements plans, 1998
  • SANDWICH PANELS FOR Zollner elektronik Vác, 30 000 m2, 1998
  • LAGERMAX sERVICE HALL AND OFFICE Budaörs, 1000 m2, precast and prestressed elements, with a span of 25 m, 1996
  • PRODUCTION HALL AND OFFICES FOR ZOLLNER ELEKTRONIK Vác, 3x5000 m2. Structure from precast elements, 2-3 storeys, with a span of 15 m, 1995

Appartment houses

  • PASSIVE ROW HOUSE Dunakeszi, structural design of passiv row house with 4 flats. Reinforced concrete base slab, walls and slab. Wooden roof structure with nail plates, 2009
  • TAMÁSI ÁRON STREET 9. Budapest, 1000 m2, 4 levels, foundation raft, in situ reinforced concrete structure and masonry walls, reinforced concrete core, columns, flat slab, 2006
  • MANDARIN GARDEN Budapest, Bartók Béla street 98-102. 1 basement level + 9 levels, 43 000 m2, foundation raft, in situ reinforced concrete structure, reinforced concrete cores, columns, flat slabs, brick fill in walls, 2005
  • KAROLINA RESIDENTAL HOUSE Budapest, Ibrahim street 26-28. and 30-38. 1 basement level + 9 levels, 19 500 m2, foundation raft, in situ reinforced concrete structure, reinforced concrete cores, columns, flat slabs, brick fill in walls, 2004
  • HÁRSLIGET MANSIONS Budapest, in situ concrete slabs with load bearing walls, 2000

Renovation, strengthening

  • MONTE TOKAJ WINERY Abaújszántó, Hungary. 4400 m2 building complex, existig buildings made of stone and masonry walls, masonry arches, existing masonry arched tunnels. Supervision and analysis of existing arch structures. New buildings planned with in situ rc structures. New wooden roof structures.
  • MOM PARK CINEMA Budapest, Alkotás street. Reconstruction of an operating movie. Rebuilding of 4 movie halls and the entrance hall for office area, cca. 4000 m2. Construction of new lifts, shafts, stairs, demolition of cinema grandstands, new slabs, strenghtening of columns and foundation, 2009-2010
  • KLOTILD PALACE Budapest, Ferenciek square, 10 000 m2, state of the art of existing structures, permission documentations for rebuilding, rebuilt of the structures. Execution design and drawings for rebuilding, 2004-2008
  • RECONSTRUCTION OF WATER TOWER at Gyula, statical expertise, execution drawings for structural reconstruction. Water proofing of the inner surface of the water tank, 2002
  • WORKING PLANS for strenghtening silo structure at Törökszentmiklós, 500 t, 2001. május
  • RECONSTRUCTION OF WATER TOWER at Mezőhegyes, statical expertise, execution drawings for structural reconstruction. Water proofing of the inner surface of the water tank, strenghtening of the bottom slab, 2000
  • GROUTING (INJECTION) TECHNOLOGY of chimneys of Paks Power Station (with Techno-Consult Kft.), 1998
  • EXPERT'S OPINION about the 100 m high chimneys of Paks Power Station in case of earthquake, 1998
  • QUALITY CONTROL of the reconstruction works of the chimneys at Paks Power Station, 1997
  • STATICAL EXPERTISE about cooling tower type 2 PCE for company Nitrogén Művek, Pét, 1997
  • PASS JUDGEMENT about bids having done for reconstruction work at "Népstadion" for football, 1996

Scheduled monuments

  • REFURBISHMENT OF MUSEUM OF ART AND DESIGN Budapest, 18 000 m2 existig building, masonry walls, clay tile arches, steel structures for cupola and atrium. Strengtening structures against eartquake loads. 7000 m2 new building part, 3 basement levels with diaphragm walls, 5 upper levels, 6-12 m span floor beams. In situ reinforced concrete mixed with precast elements, 2012-2013
  • SOPRON FIRE TOWER Structural design of the refurbishment of a 400 year old historical tower. Strengtening of mixed wall structure with injection, post stressing for seismic actions. Strenghtening of foundation. Widening of gate according to former estate, 2003, 2009
  • KAISER SPA Budapest, 4200 m2, structural design of the refurbishment of a 320 year old historical spa building from the turkish age. New water tight structures, strengtening of wall structure, new slabs, 2006-2007
  • EXPERT'S OPINION about roof structure of Mária-Magdolna Church at Zalaegerszeg, 1998
  • RECONSTRUCTION WORK for castle at Szirmabesenyő, 1996
  • EXPERT'S OPINION about the church at Zsámbék from the XVIth century, 1994

Villas

  • DIANA STREET 21. Budapest 12. district, 2003
  • ErdŐalja STREET Budapest 3. district, 1999
  • Diana STREET 19. Budapest 12. district, 1999

Expert's opinions, consultancy

  • FCSM NORTH-PEST WASTEWATER PLANT Budapest 4. district. Analysis of reinforced concrete structure and supervision of fixing points because of redundant damages in the agitator stands. Expertise, 2012
  • DREAM ISLAND Budapest, Hajógyári Island. Expertise of the existing historical buildings of ship factory. Longspan steel halls and masonry office buildings. Expertise, structural feasibility study, 2010
  • Static control for AUDI HUNGARIA, Static control for Győr G10 Industry Hall, Dömges+Partner (Gamell), 2000
  • Statical expertise report about the existing building structures at budapest, dohÁny street 12-14. 11 000 m2, 1999
  • Statical expertise about watertower in mezŐhegyes, 500 m3, 1998
  • Statical expertise about watertower in komÁrom, 1500+1000 m3, 1998
  • Design of reconstruction works of CHIMNEYS OF PAKS POWER STATION, 1997

BAMTEC design